TO: | Gary Hartnett, SDAPCD |
REPORT DATE: | February 13, 2002 |
APPROVED BY: |
Suzanne Blackburn, Senior Chemist, SDAPCD (Signed)
|
TEST SITE: |
UCSD 9500 Gilman Drive La Jolla, CA 92093 |
EQUIPMENT: |
Unit #1. Solar SoLoNOx Titan 130S Gas Turbine 12.894 MW, 17,294 hp. 148.64 MMBtu/hr, Natural gas fired. SCONOX and SCOSOX control system.
|
LIMITS: |
Rule 69.3.1: 2.5 ppmv NOx at 15% O2, 1.63 lb/hr NOx, 5.0 ppmv CO at 15% O2. Certified NOx and O2 CEMS (40CFR60 Appendix B).
|
APPLICATION NO: |
974480
|
TEST DATE: |
December 19-20, 2001
|
TESTED BY: |
San Diego Air Pollution Control District Source Test Team
|